benefits of ET-DSP™
- minimum time, maximum results
Installation of the ET-DSP™ system can be as quick as one week. The ET-DSP™ process can reach target temperature in a matter of two to four weeks. Meeting minimum concentration levels can be achieved in months, not years. 99.9% contaminant recovery is attainable.
- low cost
Depending on individual site characteristics, per unit remediation costs can range from $70 to $140 per cubic yard.
- flexible implementation
The ET-DSP™ system can be scaled up or down without losing efficiency in cost, time or effectiveness. ET-DSP™ can tackle challenges ranging from relatively small leaking underground storage tanks to large Superfund NPL site. ET-DSP™ can also be implemented alongside and enhance other remediation technologies.
- real time data and reporting
Get immediate access to accurate, real time, subsurface data and customizable reports when you want making regulatory compliance easier.
- geographic and surface preservation
Remediation is achieved without removal of soil or altering the existing landscape. ET-DSP™ system equipment is non-obtrusive and whisper quiet, with a remarkably small footprint.
- low operatonal personnel demands
Operations can be easily manned by no more than two persons. The majority of ET-DSP™ processes are controllable via a secure, real time, web-based interface.