benefits of ET-DSP™

  • minimum time, maximum results
    Installation of the ET-DSP™ system can be as quick as one week. The ET-DSP™ process can reach target temperature in a matter of two to four weeks. Meeting minimum concentration levels can be achieved in months, not years. 99.9% contaminant recovery is attainable.
  • low cost
    Depending on individual site characteristics, per unit remediation costs can range from $70 to $140 per cubic yard.
  • flexible implementation
    The ET-DSP™ system can be scaled up or down without losing efficiency in cost, time or effectiveness. ET-DSP™ can tackle challenges ranging from relatively small leaking underground storage tanks to large Superfund NPL site. ET-DSP™ can also be implemented alongside and enhance other remediation technologies.
  • real time data and reporting
    Get immediate access to accurate, real time, subsurface data and customizable reports when you want making regulatory compliance easier.
  • geographic and surface preservation
    Remediation is achieved without removal of soil or altering the existing landscape. ET-DSP™ system equipment is non-obtrusive and whisper quiet, with a remarkably small footprint.
  • low operatonal personnel demands
    Operations can be easily manned by no more than two persons. The majority of ET-DSP™ processes are controllable via a secure, real time, web-based interface.